Visual Comfort Modern Collection 700MOBHSC60S
700MOBHSC60S Product Description
The MonoRail S Curve rail is pre-bent into a smooth horizontal S shape to add visual movement and flexibility to MonoRail lighting systems. Finished in Satin Nickel, this rail component enhances modern and architectural lighting layouts with a sculptural profile. Designed for ceiling-mounted MonoRail installations, it allows designers to create dynamic lighting paths without on-site bending. Ideal for custom lighting applications, it integrates seamlessly with other MonoRail system components. For alternate factory bends, custom quotations are available.
Specifications
Brand: Visual Comfort Modern Collection
Product Family: Monorail
Type: Rail S Curve
Reflector Finish: Satin Nickel
Ceiling Appearance: Rail Mounted
Housing Rated: ETL
Dimensions: Pre-bent S-Curve (0.3" W × 0.3" L, Max Adj. Height 0.6")
Function: Ceiling Rail Component
SKU: 700MOBHSC60S
UPC: 756460858896
About Visual Comfort Architectural:
Light is the only design element that affects every other design element. By collaborating closely with architects, lighting designers and interior designers to understand their needs and to solve their toughest challenges, we have gained broad recognition for combining a passion for every design detail with an appreciation for the way our fixtures illuminate a space. Our Architectural Lighting Collection will help you achieve layers of light, highlight key focal points, illuminate critical task surfaces, and create visual interest and visual comfort. We offer a broad portfolio of architectural lighting to meet almost any specification and budget.
Additional information about the product goes here. You can customize this content as needed.
Dynamic shipping reviews will be loaded here.
